Home
Deck Building Deck Replacement Composite Decking Deck Repair Deck Staining Deck Railings
About FAQ Contact Call (947) 888-3152
Deck with patio furniture and a table umbrella beside autumn trees
Permit drawings included 42-inch frost footings Freestanding on brick

Deck Builders in Rochester Hills, MI

We design, permit and build decks across Rochester Hills, including the freestanding framing a brick-faced house needs and the tall-post work a walkout lot needs. Drawings, footings, guards and stairs to the city's adopted guide. Call for a written quote.

The numbers a deck here gets built to

42 inFooting depth below grade, on undisturbed soil
6 x 12 inConcrete pad at the bottom of every post hole
25 psfOakland County ground snow load
40 + 10Live and dead load, in psf, the framing carries
2,500 psiMinimum concrete strength in those footings
200 sq ftDeck size that triggers a building permit
3 ftDistance from the dwelling that triggers one on its own
5 ftMinimum clearance from a side property line
Why us

Why hire a builder who reads the city's deck guide?

Because in Rochester Hills the guide decides the deck. The city adopts the regional wood deck construction guide, and a copy has to sit on the job site at every inspection. That guide sets footings 42 inches down on undisturbed soil, a six by twelve inch concrete pad at the bottom of each post hole, and it states plainly that a ledger may not attach to brick veneer. On a brick-faced house the deck therefore comes off the wall entirely and carries itself on its own posts. We price it that way at the first visit. Finding out at the open-hole inspection is the expensive version.

Drawings the counter accepts

A plot plan showing setbacks, easements and utilities, plus scaled framing plans with footing size, post and beam spans and joist spacing. That is the set the city asks for.

Freestanding framing on brick homes

No ledger on veneer. The deck gets its own posts and beam line against the wall, so the load path never touches the cladding.

Footings dug for this frost depth

42 inches to undisturbed soil, and holes within 5 feet of the house taken down to the house foundation elevation so the two do not move apart.

Built for the walkout lots

Tall posts, lateral bracing, a guard the whole way round and a stair flight with risers that match to within an eighth of an inch.

Hardware that survives treated lumber

Hot-dip galvanized or stainless throughout, fasteners and connectors matched, because modern copper-based preservative eats plain steel.

Old deck hauled and disposed correctly

Treated lumber goes to a landfill that takes construction debris. Never burned, never chipped. In Michigan that is law, not preference.

Compare deck types

Which deck actually fits a Rochester Hills lot?

Four structures, four different footing and inspection paths. What the house is clad in and how far the ground drops decides which one you get.

Deck typeAttaches to the houseFootingsGuards and stairsWhere it fits
Attached deckLedger through the rim joist, half-inch bolts staggered at 16 in42 in, at house-foundation depth within 5 ft of the wallGuard over 30 in; handrail from four risersSided houses on flatter ground
Freestanding deckNo ledger at all. Own posts and beam by the wall42 in on every pier, house-side line includedSame guard and stair rules; more posts to braceBrick and stone-veneer houses, as the city guide requires
Elevated walkout deckEither, plus a lateral load path into the framing42 in, larger diameter, more concrete per holeGuard the full perimeter, a long flight, usually a landingThe falling-away back yards this city is full of
Ground-level platformUsually detached, set out from the house42 in once it is attached or over the size limitNone under 30 in; the stair rule still appliesUnder 200 sq ft, over 3 ft off the house, no pool
Deck table and railing looking out over a wooded hillside Two-story suburban house with an attached garage
42"Frost depth

Why decks here end up taller than people expect

Rochester Hills sits on real terrain. Walkout basements are normal, the ground falls away behind a lot of these houses, and the city publishes steep-slope setback rules for hillside lots. That turns an ordinary back deck into an elevated structure: taller posts, deeper holes, a guard all the way round, and a full flight of stairs to grade. The median house here was built in 1985, so the first deck on most of them is somewhere between 25 and 45 years old. We build new decks, replace worn-out ones, fit composite and railings, and handle repair and refinishing across Rochester Hills. Winter is when we draw and permit them.

  • Plot plan and framing drawings
  • City registration before permit
  • Open-hole inspection booked
  • Interior access arranged for ledgers
  • Old lumber hauled and landfilled
  • Written quote before anything starts

The rule that changes half the quotes in this city

A ledger board cannot be fastened to brick or stone veneer, so on a brick-faced house here the deck has to stand on its own.

  • What veneer isA single wythe of brick hung off the wall for looks and weather. It carries itself. It was never designed to take half a deck's live load, and the city's adopted guide says so directly.
  • What goes wrongA ledger lagged through veneer puts a concentrated load on a cladding tie. The brick cracks or the tie pulls, water gets in, and the sheathing behind it rots until the fasteners have nothing left to grip.
  • What we build insteadA freestanding frame: a beam on its own posts set just off the wall, a second beam outboard, joists spanning between them. The house takes none of it.
  • What it changes in the quoteTwo more pier holes on the house side, a heavier beam, and bracing against racking. A real line item, and far cheaper than finding out at the open-hole inspection.
Service area

Deck work across the north end of Oakland County

Rochester Hills first, then the ring around it: Rochester and Oakland Township next door, Auburn Hills west, Lake Orion and Orion Township north, out as far as Oxford, Leonard, Addison Township, Washington Township and Romeo. Same footing depth everywhere, different permit counter. No travel surcharge inside that ring.

Rochester Hills Rochester Oakland Township Auburn Hills Lake Orion Orion Township Washington Township Pontiac Oxford Addison Township Leonard Romeo Avon Meadows Hawthorn Hills Deer Run Hitchman's Haven Estates Stony Creek Ridge Brooklands
Questions

Deck questions we get asked in Rochester Hills

A pressure-treated deck built to the city's guide typically runs $28 to $50 per square foot installed here. The spread is mostly height. A ground-level rectangle sits at the bottom; a walkout deck with tall posts, a full guard and a stair flight sits at the top. Every quote we write is per your drawings, not per a calculator.
The city requires a building permit for any new wood deck within 3 feet of the dwelling, for any deck over 200 square feet, and for any deck that forms part of an above-ground pool enclosure. Most back decks hit at least one of those. A homeowner may pull the permit on their own primary residence; otherwise the builder applies.
Brick veneer is a cladding, not structure. It carries its own weight and nothing else, so the city's adopted deck guide does not allow a ledger on it. On a brick-faced house the answer is a freestanding deck that stands on its own posts and beams next to the wall. It costs a little more in posts and footings and it is the correct build.
42 inches below finished grade, bearing on undisturbed soil, with a minimum 6 inch by 12 inch concrete pad at the bottom of each post hole. Any footing within 5 feet of the house has to bear at the same elevation as the house foundation. That is the number that stops frost heave from walking a deck out of level over a winter.
Three. First the post-hole and ledger inspection, after the holes are dug and before any concrete goes in, and the inspector needs to get inside the house to check the ledger attachment. Then an open-joist inspection before the decking covers the frame on low decks. Then a final on guards, handrails, stairs and decking.
Not quite. Decks cannot sit in an easement or a right-of-way, they need at least 5 feet of clearance from a side property line, and hillside lots carry steep-slope setback restrictions that are worth a call to the Building Department before anything is drawn. On a walkout lot that slope rule can move the whole footprint.
Roughly April through October for footings and framing, because a post hole has to reach 42 inches of unfrozen ground. Staining wants a dry stretch between 50 and 90 degrees. Winter is design and permit season, and booking then is how you get a spring slot.
It goes to a landfill that takes construction and demolition waste. Michigan does not allow open burning of construction debris, and treated lumber can never be burned or chipped for mulch. Anything built before about 2004 is likely CCA-treated, which makes correct disposal part of the job.

Book the drawings now, build in spring

Tell us the lot, the house and roughly what you want out there. We measure, draw, and put a written price in front of you before anyone digs a hole.

(947) 888-3152
Mon to Sat, 7am to 6pm
Call Now
Call (947) 888-3152